Logistics solar: frequently asked questions

Straight answers to the questions logistics operators ask most. Last updated for 2026.

Can a logistics company run on solar power?

Partly. A rooftop array can supply a large share of a depot's daytime electricity, but not all of it: solar generates only in daylight, so operations that run overnight still need grid power or a battery. How much of the generation is used on site decides the saving, which is why half-hourly meter data comes before any sizing. Most logistics sites stay connected to the grid for the rest of the load.

Is there VAT relief on solar panels for a logistics building?

Not at the zero rate. The temporary 0% VAT rate on installing solar, which runs to 31 March 2027, applies to installations in residential accommodation and in buildings used solely for a relevant charitable purpose, so a commercial depot is outside it and pays the standard 20% VAT, which a VAT-registered business can normally recover. HMRC's VAT Notice 708/6 sets out the rules.

Has the Industrial Energy Transformation Fund closed?

Yes. The IETF closed in July 2025 and gov.uk says no successor fund is planned. Check gov.uk for any current industrial energy efficiency support before assuming none exists.

What should I check before putting solar on an asbestos cement roof?

Treat it as a specialist decision before it is a solar one. Asbestos cement sheets can be fragile and a fall through one is a serious risk, so the roof needs an asbestos survey and a competent contractor's method statement (see the HSE guidance). Where the sheets are in poor condition the usual answer is to replace or over-clad the roof before any panels go on.

How much do solar panels for a warehouse cost in the UK?

A typical warehouse install is £350,000-£2.4m (500 kW-3 MW), at £700-£900/kW depending on system size. Last-mile depots (100-400 kW) range £90k-£340k. Cold-chain and large distribution centres often achieve £600/kW or below at scale. Capital is usually relieved in year one under the Annual Investment Allowance (up to the limit).

What size system can a typical UK warehouse take?

Modern logistics buildings of 100,000-500,000 sqft can accommodate 1-5 MW of rooftop PV. Smaller industrial units of 30,000-80,000 sqft typically take 200-600 kW. The binding constraint is rarely roof area, it's usually DNO capacity or building structural loading.

Can we install solar on a leased warehouse?

Yes, tenant-installed solar is common. Landlord consent is required (many institutional landlords have standard green-lease addenda). PPA structures shift the lease risk to a third-party owner. The BBP Green Lease Toolkit provides a standard addendum template.

Will the system fit around our sprinkler system?

Yes, by design. The design follows sprinkler clearance requirements, with insurer sign-off before fabrication. The PV layout is built around your sprinkler heads, not the other way around.

What about wind loading on a high warehouse roof?

Rooftop PV should be designed to BS EN 1991-1-4 (Eurocode 1) for the specific site's wind exposure. Ballasted systems are weighted for worst-case wind uplift. Exposed port and coastal sites need the site-specific design wind speed checked, and the design envelope is well-defined.

Can we install during peak season without disrupting operations?

Yes. Roof installation happens above your operations, MHE, picking, and despatch continue normally. The only operational impact is the final grid synchronisation (usually a short outage), which is usually scheduled for a weekend or planned shutdown.

What's the payback for cold storage warehouses specifically?

Indicatively 4-5 years, usually the shortest in logistics. 24/7 refrigeration provides ~90%+ self-consumption, and grid electricity is the largest cold-chain operating cost. Round-the-clock refrigeration usually gives cold stores the highest self-consumption of any logistics building type.

Will solar interfere with our customer audits (e.g. BRC, GFSI)?

No, and increasingly the audits ask for it. BRC v9, SQF, IFS, and GFSI-recognised standards now reference renewable energy adoption in their energy management criteria. Solar PV is auditable evidence of Scope 2 reduction.

What about Freeport or Investment Zone sites?

A designated Freeport or Investment Zone tax site can offer a 100% first-year allowance on qualifying plant and machinery, but only for designated tax sites, within a time limit and subject to conditions. Freeport eligibility should be checked for every applicable site. Current Freeports: Felixstowe/Harwich, Liverpool, Plymouth, Teesside, Solent, Thames, Humber, East Midlands.

Can solar charge our EV van fleet?

Yes, and the synergy is excellent for last-mile and depot operations. Daytime EV charging absorbs solar at 100% self-consumption. The EV charging infrastructure is designed alongside the PV; a typical depot install pairs 6-24 charge points with 100-400 kW of PV.

Do we need landlord consent for tenant solar?

Yes, in nearly all standard UK industrial leases. The Building Better Partnership (BBP) Green Lease Toolkit includes the standard solar addendum that most institutional landlords accept. Time required: it varies with the landlord, and institutional landlords usually take longer than owner-occupiers.

What's the difference between owning the system and a PPA?

Own (cash or asset finance): you own the asset, claim full tax allowances, and keep all kWh savings. PPA: third-party owns and operates; you pay per kWh consumed at a rate below grid retail; zero capex; off-balance-sheet. PPA is often the right choice for tenants on shorter leases, ownership for owner-occupiers.

What happens at end of lease?

Lease addendum should specify: (a) tenant removes the system at expiry (typical for short leases); (b) tenant transfers ownership to landlord at agreed value; or (c) PPA continues with successor tenant. The BBP toolkit covers all three. A valuation of a 5-10-year-old system can support the lease-end process if needed.

Sources and assumptions

The rules, rates and dates quoted on this page come from the official pages below. Reliefs, tariffs and deadlines change, so check them before you rely on a figure.

Last checked 31 October 2026.

Send your site details

We reply by email

Tell us about your site and what you need. There is no obligation.

By submitting you agree to our privacy policy. It sets out who can see your enquiry.

Send an enquiry
Send an enquiry